ShankuChakra Protocol
SCP-004 — Sample Approval Protocol
Revision date: 2026-09-01
ShankuChakra recommended operational protocol — this is not an official government or international standard.
Purpose
To ensure that a product sample sent to and approved by a buyer accurately represents the bulk shipment, reducing the risk of a quality mismatch claim later.
Scope
Applies whenever a pre-shipment sample is sent to a buyer for approval prior to bulk production, packing or shipment.
Definitions
- Reference sample
- A retained portion of the exact sample sent to and approved by the buyer, kept for comparison against the bulk shipment.
Required Information
- Sample batch/lot identification
- Date sample was drawn and dispatched
- Test results accompanying the sample, if available
- Buyer's approval or rejection response and any conditions attached
Procedure
- Draw the sample from a lot that is genuinely representative of the intended shipment source, not a separately selected best-case lot.
- Retain a sealed, labelled reference sample and record of test results for the exact material sent to the buyer.
- Send the sample to the buyer with a clear reference number and, where practical, an accompanying COA.
- Obtain the buyer's written approval, including any conditions or tolerances stated, before proceeding to bulk production.
- At the pre-shipment stage, compare the bulk shipment sample against the retained reference sample and test results.
Checklist
- Sample drawn from representative lot
- Reference sample retained and labelled
- Test results attached to sample where applicable
- Written buyer approval obtained before bulk production
- Bulk shipment compared against reference sample before dispatch
Documents Required
- Sample dispatch record
- Buyer approval confirmation
- Reference sample retention log
Risks
- Sending a non-representative 'best case' sample that the bulk shipment cannot match
- Proceeding to bulk production without documented buyer approval
- No retained reference sample, making later quality disputes difficult to resolve objectively
Common Mistakes
- Not recording which specific lot/batch a sample was drawn from
- Treating a verbal 'looks fine' as approval without written confirmation
- Discarding the reference sample before the shipment is delivered and accepted
Verification Points
- Was the sample representative of the intended production lot?
- Is buyer approval documented in writing?
- Has the reference sample been retained until final delivery acceptance?
Disclaimer
This is a ShankuChakra recommended operational protocol, not an official government, regulatory, or international standard. It reflects common industry practice and should be adapted to the specific buyer, product, destination and contract. Always verify current legal, regulatory and customs requirements with the relevant authority before relying on this protocol for a commercial shipment.